Mixed-use project at 1800 W Beverly Boulevard set for completion in late 2023
02/28/23
Construction of a new multifamily residential complex at 1800 W. Beverly Boulevard is on track for completion in late 2023, Los Angeles-based developer Cityview announced this month.
The project, which was recently given the name “Belle on Bev,” occupies the southern side of Beverly Boulevard between Bonnie Brae Street and Burlington Avenue. The six-story building will feature 243 residential units, 3,500 square feet of ground-level retail space, and a 292-car garage at completion.
Cityview secured approvals for the project using density bonus incentives to permit a larger structure than otherwise allowed by zoning rules. In exchange, 21 of studio, one, and two-bedroom apartments will be set aside for rent as very low-income affordable housing.
Read Publication